Well with 145,000 on the ODO I figure it is time to kill some long overdue maintenence. The VX has walked through all the abuse I have thrown at it and I want it to continue that way!
All parts will be ordered/bought this week and work will commence after my last race for the season (10/21).
So here is the to do list...
Brake booster
timing belt/water pump
blower resister
E-brake pads
front shocks (bilsteins)
outer rear axle seals
and indy adjustable hd links
then new front shocks, upper and lower ball joints on the wifes truck!
Fun, fun, fun!